House extensions in Liverpool & Merseyside
Extensions in Liverpool, Sefton and Knowsley are carried out by Crown Roofing Solutions. This page covers the main types, the planning and building rules, roofs, and how a project runs from first call to sign-off.
Many single-storey rear extensions in Liverpool don't need planning permission: up to 3 m deep on a terrace or semi and 4 m on a detached house. Tell us what you're planning, the builder visits, confirms what's needed (engineer, planning, building control, party wall) and a free written quote follows.
Extension types: rear, side return, wrap-around, two-storey
The four common types are a single-storey rear extension, a side return, a wrap-around (rear and side together) and a two-storey extension. Which suits you depends on the house, the garden and how much room you need.
- Single-storey rear extension: the most common, usually for a bigger kitchen or kitchen-diner with bifold or sliding doors.
- Side return: on Victorian and Edwardian terraces, the narrow alley beside the back outrigger is filled in to widen the kitchen. Often finished with a glazed or part-glazed roof.
- Wrap-around: a side return and rear extension built as one L-shaped space. It needs planning permission in most cases.
- Side extension: on semis and detached houses, a single-storey side extension can be a utility room, toilet or wider kitchen, sometimes replacing a garage.
- Two-storey extension: extra bedrooms upstairs as well as space downstairs. Usually needs planning permission and more structural design.
- Building on top of a single-storey extension: possible only if the foundations and walls can take the load, which an engineer checks first.
| Extension | Permitted development limit |
|---|---|
| Single-storey rear, terrace or semi | Up to 3 m deep from the original rear wall |
| Single-storey rear, detached | Up to 4 m deep |
| Larger single-storey rear (prior approval) | Up to 6 m (terrace or semi) or 8 m (detached) |
| Single-storey height | Up to 4 m; eaves no higher than 3 m within 2 m of a boundary |
| Single-storey side | Up to 4 m high and no wider than half the original house |
| Two-storey rear | Up to 3 m deep and at least 7 m from the rear boundary |
Permitted development limits for houses (not flats or maisonettes):


How an extension works, start to finish
An extension starts with a visit and drawings, goes through approvals, and then the build follows a set order: foundations, walls, roof, windows and doors, then the inside. Here's how it works when you get in touch through this site.
- Tell us what you're planning: the room you want, rough sizes, and any drawings you already have.
- The builder visits to look at the house: the ground, drains, boundaries, the wall you'll knock through and the roof you'll join to.
- They confirm whether the project is one they can take on, and what it needs: a structural engineer, planning permission or a lawful development certificate, building control, and a party wall notice where relevant.
- A written quote follows. It's free, and it should list what's included and what's left to you.
Not every loft or extension suits every builder. You'll be told at the visit if yours isn't one we can do.
Drawings and approvals. Plans are drawn by an architect, architectural designer or plans technician. If planning permission is needed, councils aim to decide householder applications within eight weeks. Building Regulations approval is separate and needed for almost every extension.
Foundations. Many extensions in Merseyside go on trench-fill concrete foundations, at a depth set by building control after the trenches are dug and inspected. Clay soil, nearby trees or poor ground can mean deeper or piled foundations. "Extensions without foundations" are not a thing for a habitable room; small conservatories are a different case.
Party walls. Digging foundations within 3 m of a neighbour's building, and deeper than its foundations, or building on the boundary, falls under the Party Wall etc. Act 1996. Notice is at least one month for excavation and two months for work on a party wall.
The build. Foundations and drains, then walls up to roof level, the roof, windows and doors so it's weathertight, then wiring, plumbing, plastering and floors. The knock-through into the house usually comes late, behind a temporary dust screen. Ask for a written programme, because length depends on size and type.

Building regulations, drains and the 25% glazing rule
Nearly every extension needs Building Regulations approval, separate from planning. Building control checks the foundations, structure, drainage, fire safety, insulation and ventilation, and issues a completion certificate when the work is signed off.
- The 25% glazing rule: under Approved Document L, the total area of windows, doors and roof lights in an extension should normally be no more than 25% of its floor area, plus the area of any windows or doors the extension covers up. More glass, such as a big roof lantern and bifold doors together, is possible but has to be offset by better insulation elsewhere and shown by calculation.
- Insulation: new walls, floors and roofs must meet the U-values in Approved Document L. A new flat roof, for example, is usually built as a warm roof with rigid insulation above the deck. Ask for the U-value calculation, not just a thickness.
- Drains: if you build over or within 3 m of a public sewer, you need consent from the water company, which in Merseyside is United Utilities. Shared drains behind terraces are often public sewers. Approved Document H covers drainage.
- Rainwater: the new roof needs gutters, outlets and a route for the water, either to an existing drain or a soakaway if building control agrees.
- Structure: steel beams where walls are opened up, with calculations from a structural engineer (Approved Document A).
- Ventilation: kitchens and bathrooms need extract ventilation under Approved Document F.
An extension built without approval can cause trouble when you sell. For work done since November 1985, the council can issue a regularisation certificate after inspecting it, which may mean opening up parts of the work. If you're unsure whether something needs approval, check with your council's building control team.

Roofs on extensions: flat or pitched
Most single-storey extensions have either a flat roof or a pitched (sloping) roof. Flat roofs suit low eaves, side returns and roof lanterns; pitched roofs suit houses where the extension should match the main roof.
- Flat roof: the most common on rear and side-return extensions. Modern EPDM rubber, GRP fibreglass and torch-on felt are all used; it should have a slight fall (at least 1 in 80 as built) so water drains.
- Lean-to or pitched roof: slates or tiles to match the house, with roof windows if you want light. Needs enough height on the house wall to get a proper pitch under the first-floor windows.
- Roof lanterns and roof lights: let light into deep kitchen extensions, but count towards the 25% glazing rule.
- Height: under permitted development a flat-roof single-storey extension can be up to 4 m high, and no more than 3 m at the eaves within 2 m of a boundary.
Where most extension roofs go wrong is at the join with the house: the lead flashing or cover flashing where the new roof meets the old wall, and the edges, outlets and gutters. A badly detailed flat roof leaks, however good the membrane. As a guide, a new flat roof covering over a typical kitchen extension costs £1,800 to £3,500 on its own as a roofing job. Prices as of November 2026. That is the roof covering only, not the extension; the extension itself is priced after a survey.
If you already have an extension with a leaking flat roof, see our flat roofs page and flat roof cost guide.



Choosing an extension builder
Ask every extension builder the same questions and get the answers in writing. It makes quotes comparable and quickly shows who has thought the job through.
- Who draws the plans, and who does the structural calculations?
- Does it need planning permission, prior approval or a lawful development certificate, and who applies?
- Who deals with building control and the completion certificate? And with United Utilities if there's a sewer nearby?
- Who serves party wall notices?
- What exactly is in the quote: foundations, drains, steels, windows and doors, electrics, plumbing, plastering, flooring, the kitchen?
- What happens if the ground needs deeper foundations than expected? How are extra costs agreed?
- How are payments staged? Avoid paying a large sum up front.
- What insurance do you hold, and what guarantee is offered? Ask for both in writing.
Quotes are free and given in writing after the visit. Compare them line by line rather than on the total. Our guide to spotting a dodgy roofer lists warning signs that apply to any builder.
More questions about extensions
48 more questions homeowners ask, each linked straight to its answer.
ExtensionsScaffolding & how the job runsAll roofing questions
Questions people ask
How long does an extension take to build?
It depends on the size and type. A small single-storey rear extension is quicker than a wrap-around or two-storey one, and planning and building approvals add time before work starts. Ask for a written programme with your quote.
Can I build an extension without planning permission?
Often yes. Under permitted development a single-storey rear extension can go up to 3 m deep on a terrace or semi and 4 m on a detached house. Flats, conservation areas and Article 4 areas are different, so check with your council.
What is the 6 m and 8 m extension rule?
Under the larger home extension scheme, a single-storey rear extension can go up to 6 m deep on a terrace or semi, or 8 m on a detached house, if the council grants prior approval after consulting the neighbours.
Can I build a two-storey extension on a semi-detached house?
A two-storey rear extension can be permitted development if it's no more than 3 m deep and at least 7 m from the rear boundary. Most two-storey side extensions need planning permission.
Do I need building regulations for an extension?
Almost always. Building Regulations approval is separate from planning and covers foundations, structure, drains, insulation, fire safety and ventilation. You get a completion certificate when it's signed off.
What is the 25% glazing rule for extensions?
Windows, doors and roof lights in an extension should normally total no more than 25% of its floor area, plus any windows it covers up. More glass is allowed if better insulation elsewhere makes up for it, shown by calculation.
Can I build over a drain?
If it's a public sewer and you're building over it or within 3 m of it, you need consent from United Utilities first. Private drains are dealt with through building control.
Do I need a party wall agreement for an extension?
If you're building on the boundary, or digging foundations within 3 m of a neighbour's building and deeper than its foundations, the Party Wall etc. Act 1996 applies and you must serve notice before work starts.
Is a flat roof or pitched roof better on an extension?
A modern flat roof in EPDM or GRP, properly detailed, works well and allows roof lanterns. A pitched roof suits extensions that should match the house and where there's height on the wall above.
How much does an extension cost in Liverpool?
It depends on size, foundations, the roof and the finish, so it's priced after a survey. Quotes are free and given in writing after the visit.
How long does it take for a house extension to settle?
New work dries out over the first months, and fine cracks in new plaster are common in that time. Larger or growing cracks, or doors that start to stick, are worth reporting to the builder.
Book a free roof visit
- Tell us about the jobCall or send the form. A photo helps us understand it before we come out.
- We arrange a visitThe roofer comes to look at the roof in person, at a time that suits you.
- Written quote after the visitFree, with no obligation to go ahead.